Asset register for built assets
An asset register is a schedule of components that form part of a built asset such as a building. It may form part of a building owner's manual, (operation and maintenance manual or O&M manual) for a building which contains all the information required for the operation, maintenance, decommissioning and demolition of a building.
An asset register may be prepared for every component in a building, or just for the ‘active’ assets that require regular inspection, maintenance, cleaning or replacement, such as building services components.
Ideally, it should be prepared during the design stage, but it may be prepared during construction, or as part of a survey of a completed building. Software is available to help prepare and manage asset registers, and companies exist that will carry out an asset survey to compile an initial register.
An asset register may contain a wide range of information, such as:
- A description of the asset.
- Identification number.
- Location.
- Size.
- Access information.
- Supplier.
- Installer.
- Purchase price.
- Date of acquisition.
- Purchase order number.
- Date of delivery .
- Ownership records.
- Current value.
- Condition and defects.
- Maintenance requirements and intervals.
- Information about spares.
- Photographs.
- Drawing references.
- Running cost.
- Energy performance.
- Certification.
- Health and safety information.
- Service level agreements.
- Warranties.
- Disposal date.
- Method of disposal.
- Sale price.
An asset register can be useful for programming and providing the information necessary to carry out activities such as inspections, cleaning and planned preventative maintenance as well as for carrying out repairs or alterations. In addition, it can be useful for budgeting purposes, or for valuing assets, and a copy might be archived as part of an annual financial reporting process.
Asset registers will tend to be prepared digitally, will be searchable and include links to supporting documentation. They may be integrated with maintenance scheduling software, computer-aided facilities management (CAFM) software or building information models (BIM).
Increasingly, building information models (or asset information models) should include all the of information that previously might have been held on a separate asset register. An asset information model (AIM) is an operational BIM model that compiles the data and information necessary to support asset management, that is, it provides all the data and information related to, or required for the operation of an asset. The information required for an asset information model should be defined in the asset information requirements (AIR). In the case of a new asset, asset information requirements will have been used to develop the employer’s information requirements (EIR) incorporated into the tender documentation for a project.
Once compiled, it is very important that the asset register is kept up to date. Responsibility for maintaining the asset register may be given to an asset manager.
NB NRM3: Order of cost estimating and cost planning for building maintenance works, defines an asset register as: '...a record of applicable maintainable assets, including information such as constructed specification, operational performance data, financial and technical details about each asset.'
See also: Creating an asset register for construction projects.
[edit] Related articles on Designing Buildings
- Asset information model
- Asset information requirements.
- BIM and facilities management.
- BIM.
- Building owners manual.
- Contract register.
- Construction Operations Building Information Exchange (COBie).
- Creating an asset register for construction projects.
- Employers Information Requirements.
- NRM3.
- Service level agreement.
- Site records and registers.
- Types of register
Featured articles and news
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.